Eric Schulte
30259844b9
DONE Both supplied
2009-07-21 16:46:53 -06:00
Eric Schulte
fe0532e509
DONE One supplied, one default
...
We are now skipping results lines when resolving references which
specify arguments, as the arguments would change the value of the
source-code block.
2009-07-21 16:46:26 -06:00
Eric Schulte
2bfa420c6a
DONE empty parens () not recognised as lob call
2009-07-21 16:27:48 -06:00
Eric Schulte
68bd53cf7c
Merge branch 'master' into investigation
...
Conflicts:
org-babel.org
2009-07-21 16:00:42 -06:00
Dan Davison
5d1ee80683
Adding tests of default args using lob evaulation.
2009-07-21 15:48:45 -04:00
Dan Davison
ad7b17c393
Moving nested evaluation from Tasks to Bugs
2009-07-21 15:48:14 -04:00
Eric Schulte
53c08df3ae
so it looks like regardless of the syntax used we're not overriding
...
the default argument values.
2009-07-21 12:22:59 -06:00
Eric Schulte
a58dd8e3af
bringing in o-b.org from evaluation branch
2009-07-21 12:15:38 -06:00
Bastien Guerry
3c031462f5
Bugfix about using a separate frame for the Calendar.
...
When the Calendar is displayed in a separate frame, Org was
confused and could not find it; this tiny change fixes this.
2009-07-21 09:29:55 +02:00
Bastien Guerry
7896ef6292
org-export-generic format: Fix compatibility issue with Emacs 23.
...
Patch by Wes Hardaker <wjhns209@hardakers.net>
2009-07-21 07:51:32 +02:00
Eric Schulte
d4b7914f7c
DONE gnuplot [7/7]
2009-07-20 14:04:37 -06:00
Eric Schulte
85dc35656d
DONE gnuplot sessions
2009-07-20 13:33:53 -06:00
Eric Schulte
ed42f95106
DEFERRED header argument specifying 3D data
2009-07-20 13:20:06 -06:00
Eric Schulte
104f05ef5e
DONE helpers from org-plot.el
2009-07-20 13:10:28 -06:00
Eric Schulte
e5b2e307fa
removed the result-params from the let in org-babel-gnuplot,
...
keeping the vars line in the let for now because of the peculiar
handling of the vars in gnuplot.
2009-07-20 13:10:11 -06:00
Eric Schulte
809462e3ee
Merge branch 'master' into gnuplot
...
Conflicts:
lisp/langs/org-babel-gnuplot.el
With respect to the conflict, I will try removing the lines you
mentioned before my next commit.
2009-07-20 13:07:29 -06:00
Bastien Guerry
e1206a5863
Cleanup: removed trailing blank lines.
2009-07-20 21:05:01 +02:00
Eric Schulte
c81479b161
added a :file header argument to gnuplot
2009-07-20 13:04:40 -06:00
Bastien Guerry
bca97831a2
Fix typo.
2009-07-20 21:03:03 +02:00
Bastien Guerry
0859d42afc
Refine the section title: "Setting up Remember for Org"
...
Otherwise it sounds like a section on how to set up Remember
generally, not only for Org.
2009-07-20 21:02:20 +02:00
Bastien Guerry
3d4e59df4d
Cleanup: use lowercase after the column sign.
2009-07-20 20:59:12 +02:00
Bastien Guerry
7636d499eb
Cleanup: add a line before an example.
2009-07-20 20:49:00 +02:00
Bastien Guerry
11cc6e57b3
Mention that remember.el comes with Emacs 23, not Emacs 22.
...
Also slightly rephrase the introductory paragraph.
2009-07-20 15:57:25 +02:00
Carsten Dominik
4183124c4b
Keep compiler happy
2009-07-20 09:16:28 +02:00
Carsten Dominik
5f87a31fb7
Fix problems in org-mac-message.el
...
The return value of some functions was not correct because of a
message form at the very end. Also, Simplified a few functions.
2009-07-20 09:09:42 +02:00
Carsten Dominik
809fcf9d78
Improve refile history to contain exact matches only
...
This was a proposal by Samuel Wales. After the user selected a
refiles target, we make sure that the fully qualified target is in the
history, so that next time, UP will bring back exactly this target.
2009-07-20 09:01:33 +02:00
Dan Davison
4589aacb51
A couple of fixes to sketched-out parsing algorithm.
2009-07-20 01:33:40 -04:00
Dan Davison
5a5a4253c6
Some notes on possibly adding a recursive evaluation mechanism.
...
Currently we can't have nested function calls, and I think that a general fix for that would require going the standard route of constructing a parse tree and evaluating it recursively.
2009-07-20 01:24:33 -04:00
Eric Schulte
307c7667db
still working on gnuplot variable support
2009-07-19 16:40:28 -06:00
Dan Davison
a16a15ea80
Merging R-results into master.
2009-07-19 18:09:22 -04:00
Dan Davison
b766b094a0
Using temp function definition to tidy R evaluation code.
2009-07-19 18:03:33 -04:00
Eric Schulte
9bdddde454
gnuplot: switching to using user defined variables for handling variables
...
This will require gnuplot version 4.2 or up
2009-07-19 15:46:05 -06:00
Dan Davison
2b66de1c1b
Reorganising R evaluation code.
...
With this change we avoid messing about extracting the output from the
comint buffer in the :results value case (the value has already been
written to file).
2009-07-19 17:45:00 -04:00
Dan Davison
7ac2e0d45f
Using o-b-chomp rather than o-b-trim on R output.
...
This keeps columns of STDOUT correctly aligned.
2009-07-19 17:35:49 -04:00
Eric Schulte
01c6bd2b33
pulled the gnuplot variable processing out into it's own function
2009-07-19 15:30:40 -06:00
Eric Schulte
20eec8d94b
additional requirements and initialization for gnuplot
2009-07-19 15:01:47 -06:00
Eric Schulte
006d6d1193
deferring more sophisticated gnuplot prebuilt helpers
2009-07-19 14:53:12 -06:00
Dan Davison
162b522728
Fixing srcname function call regexps.
...
But still some improvement of this to be done (see bugs section).
2009-07-19 14:29:10 -04:00
Dan Davison
bd1ff11b4e
Merge commit 'origin/master'
2009-07-19 13:58:03 -04:00
Dan Davison
aa1747b065
Quite a few revisions / additions to the tasks and bugs lists.
2009-07-19 13:56:38 -04:00
Dan Davison
e4d14d41ec
This should have been part of the parent commit ( 911e77a7c9
)
2009-07-19 13:55:42 -04:00
Bastien Guerry
e17368ca76
Also use TAB for completion with org-insert-link.
...
Before this patch the completion mechanism was this: TAB let's you
complete through link prefixes (gnus: file: bbdb: ...) then RET allows
completion if a completion mechanism is available for the chosen prefix.
Navigating through the history of stored links was a separate process,
available through the up/down M-n/M-p keys.
Now TAB not only completes through link prefixes but also through stored
links. This behavior matches other Emacs completion mechanisms a bit
more closely.
2009-07-19 19:45:06 +02:00
Eric Schulte
b57617bc53
Merge branch 'master' into gnuplot
2009-07-19 11:37:58 -06:00
Eric Schulte
1df8d69c7c
some minor additional discussion in o-b.org
2009-07-19 11:17:32 -06:00
Eric Schulte
585f69d1f7
Merge branch 'master' into gnuplot
2009-07-19 11:12:09 -06:00
Eric Schulte
c9752352ea
added task: "TODO gnuplot support for column/row names"
...
Adding support for column/row names (as currently being implemented
for R) on a language by language basis is definitely the right way to
handle this hline/header issue. I am going to try to do the same for
gnuplot.
2009-07-19 11:11:55 -06:00
Eric Schulte
28c3262848
fixed variable name in org-babel-R-evaluate
2009-07-19 11:06:44 -06:00
Eric Schulte
91301b8c29
Merge branch 'master' into gnuplot
2009-07-19 11:02:17 -06:00
Dan Davison
911e77a7c9
Code rearrangement: restrict R column names changes to org-babel-R.el.
...
On reflection this is (currently) R-specific functionality and should
not affect the code in org-babel.el.
2009-07-19 12:01:00 -04:00
Bastien Guerry
ffa046d38b
Fix typo in orgstruct++-mode docstring.
2009-07-19 14:37:59 +02:00